Case Studies

Real plants. Real numbers.

Identify the limiter. Correct it. Make it hold. Here is what that looks like on the floor.

Automation

Juul Labs

6% → 80%

OEE Improvement

High-speed automation line stabilization at hypergrowth

First-of-its-kind automation line. Started at roughly 6% OEE. Stabilized through downtime-driven prioritization, preventive maintenance discipline, spare parts strategy, and data integrity correction.

  • OEE moved to ~40% quickly by eliminating the largest downtime drivers
  • Continued iteration drove OEE to approximately 80%
  • Maintenance and prioritization systems institutionalized for long-term reliability
Turnaround

RF Code

99.93%

First-Pass Yield

Manufacturing turnaround and leadership

Started as a one-month diagnostic. Extended to nearly two years as acting Director of Manufacturing, overseeing domestic operations and contract manufacturer management.

  • Lead time: 13.1 days → 10 days
  • On-time delivery: 89.98% → nearly 100%
  • Manufacturing leadership rebuilt, leaving behind a fully functional and self-sufficient manufacturing team
R&D to Prod

Large Industrial 3D Printer Manufacturer

R&D → Production

Full Ownership Transfer

Industrial 3D printer platform launch

Took a next-generation industrial 3D printer platform from R&D prototype to a fully manufacturable system with a repeatable, documented build process.

  • Purpose-built tooling and validated test procedures delivered
  • Training and work instructions established
  • Client could build, support, and deploy at scale without ongoing R&D team involvement